Road and Drainage Works Advance in Saint Peter and Saint Thomas

Date:

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, September 24, 2026, personnel in the Roads and Drains Division of the Public Works Department (PWD) issued an update to a report first published on Tuesday, September 22, 2026, which provided the status of ongoing projects being spearheaded by the Division at Half Way Tree, the CLICO Housing Development in Saint Peter, and along the F.T. Williams Highway.

For a detailed summary of the team’s activities, please see Table 1.

ActivityLocationStatus
Drain RepairsHalf Way TreeOngoing
BasingCLICO Housing DevelopmentOngoing
PatchingF.T. Williams HighwayHalted

Table 1: PWD’s Roads and Drains’ Division Activities on September 24, 2026

The PWD is reminding road users to exercise caution while travelling through active work sites and thanks the public for its usual cooperation.

The Roads and Drains Division of the Public Works Department is dedicated to maintaining and repairing public roads and drainage systems across Saint Kitts. To help the Division identify roads, drains and traffic lights in need of repair, please visit our Street Scout page today!

Learn more about the Public Works Department at mopieudt.gov.kn and follow the PWD’s Facebook page and Ministry’s social media pages for updates.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...