PWD Daily Tracker – August 29/30, 2024

Date:

Watch the Daily Tracker for the latest reports on the whereabouts of the Roads Team at the Public Works Department.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Operations at East Park Range and The Bay Road

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, October 15, 2026, the Roads and Drains Division of the Public Works...

PWD Continues Work in Newtown and Douglas Estate

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, October 8, 2026, the Roads and Drains Division in the Public Works...

PWD Continues Work in Half Way Tree and Douglas Estate

Basseterre, Saint Kitts (Public Infrastructure News) – On Friday, October 2, 2026, the Roads and Drains Division in the Public Works...

PWD Improves Roads and Drains Across Multiple Communities

Basseterre, Saint Kitts (Public Infrastructure News) – On Wednesday, September 30, 2026, residents in Bird Rock, Douglas Estate, and Half...