Concrete Crew Improves Drainage in Verchilds

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – Basseterre, St. Kitts – Over the past few weeks, the concrete crew of the Roads Division of the Public Works Department (PWD) has been working to improve drainage along the island’s Main Road in Verchilds.

During the week of February 17, 2025, the crew began its efforts to repair the underground culvert. This involved cutting and excavating the road and preparing the base for casting. The crew initiated concrete blinding, which is the process of creating a stable or level foundation by pouring a thin layer of concrete over another surface as a base for other construction work. The crew also began to lay matting, cast a 5″ concrete base, and lay 8″ blocks.

Work is expected to continue into March 2025. Accordingly, the PWD is reiterating its request for road users to exercise caution when traveling through the area for their safety and that of its team.

This initiative demonstrates PWD’s ongoing commitment to improving public infrastructure throughout the island.

For more news from the Public Works Department and the Ministry of Public Infrastructure, Energy, Utilities and Domestic Transport, visit mopieudt.gov.kn and follow us on Facebook.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Operations at East Park Range and The Bay Road

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, October 15, 2026, the Roads and Drains Division of the Public Works...

Bay Road Collapse Prompts Road Closure, Assessments

Basseterre, St. Kitts (Public Infrastructure News) – An unexpected asphalt collapse along the Bay Road near Thibou Avenue in...

PWD Continues Work in Newtown and Douglas Estate

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, October 8, 2026, the Roads and Drains Division in the Public Works...

PWD Continues Work in Half Way Tree and Douglas Estate

Basseterre, Saint Kitts (Public Infrastructure News) – On Friday, October 2, 2026, the Roads and Drains Division in the Public Works...