Government Breaks Ground on Solar Desalination Plant Donated by the United Arab Emirates (UAE)

Date:

Canada Industrial Estate, St. Kitts (Public Infrastructure News)— On March 18, 2024, the Government of St. Kitts and Nevis officially broke ground on a Solar-Powered Water Desalination Plant at Canada Industrial Estate. It is the first of two plants funded by the UAE as part of its Caribbean Renewable Energy Fund (CREF). The second plant is set to be constructed in Nevis.

Minister of Public Infrastructure, Energy and Utilities, Hon. Konris Maynard, expressed gratitude to the UAE for supporting the project, which comes at a time when the country is grappling with diminishing rainfall totals that continue to reduce the quantity of water retrievable from existing groundwater sources.

Each plant can produce 12 cubic metres of fresh potable drinking water per hour. If the plant runs for 24 hours, it can produce up to 76,000 gallons of water daily. The electricity needed to power the desalination plant will be generated on-site from solar photovoltaic (PV) panels during the day, while SKELEC’s grid will power the plant at night.

The Abu Dhabi Future Energy Company PJSC—Masdar of Abu Dhabi, UAE, has been appointed as the Project Manager/Implementing Agency. Omosun of France and its main local subcontractor, Kelly Construction, have been selected as the successful contractors for the project. The budget for each plant is approximately US1.1 million.

The plant should be substantially completed by June 2024. It is being constructed on 4 acres of land at Canada Estate and will utilize less than 1 acre. This site has been identified for future expansion of desalination to meet the growth in water demand as St. Kitts continues to develop. Connecting pipelines and the electrical connection to the electricity grid are being supplied by the government.

Trans-Global Engineering (TGE) Ltd, a local company, undertook the necessary environmental impact assessment (EIA) study, which the Development Control and Planning Board (DCPB) approved.

According to the Water Services Department, raw seawater will be collected via two beach wells and pumped to the Reverse Osmosis (RO) plant via a 4-inch water line. The rejected brine (super concentrated salt water) will be pumped out to sea via a 4-inch line with a diffuser at the end. The fresh water will be pumped via a 4-inch line to the existing water network to supply either Keys Village or Canada Industrial Site or Conaree.

There are over 300 residents in Keys Village, and they consume about 30,000 gallons per day. With a capacity of 76,000 gallons per day, the plant will provide enough water to supply Keys and the surrounding areas.

A 3-month timeline has been agreed upon for the UAE to train Water Services Department staff to operate and maintain the plant.

Left to Right: Cabinet Secretary Dr. Marcus Natta, Permanent Secretary Daryll Lloyd, Senior Minister Dr. Denzil Douglas, Deputy Prime Minister Dr. Geoffery Hanley, Prime Minister Dr. Terrance Drew, Minister of Public Infrastructure Konris Maynard, UAE Representative and Project Manager, Oliver Broughton, and Attorney-General Garth Wilkin.

The official groundbreaking ceremony occurred at Canada Estate on March 18, 2024, and brought together government ministers, senior government officials, representatives of the Ministry of Public Infrastructure, Energy and Utilities, and representatives of the UAE.

Learn more about the Ministry of Public Infrastructure, Energy and Utilities, our projects and initiatives, by visiting the ministry’s official website, social media pages, and Public Infrastructure News.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

Notice of Water Service Interruption Affecting Dewars, Beacon Heights and Upper Shadwell

Basseterre, Saint Kitts (Public Infrastructure News) – Residents and business owners in Dewars, Beacon Heights and Upper Shadwell are advised that...

WSD Issues Service Interruption Notice Affecting Half Moon & Fort Tyson Rise

Basseterre, Saint Kitts (Public Infrastructure News) – Residents and business owners in Half Moon & Fort Tyson Rise are advised that...

Basseterre Desalination Plant Back Online After Pipeline Repairs

Basseterre, Saint Kitts (Public Infrastructure News) – The Basseterre Desalination Plant is back online following maintenance on two...

Water Service Restored Following Urgent Pipeline Work in Camps and Bay View

Basseterre, Saint Kitts (Public Infrastructure News) – Water service has been restored to residents and businesses in Camps and...